Pavement Condition Survey in Oklahoma
For the Oklahoma Department of Transportation (ODOT)
GIE Technologies and Dynatest were on a shortlist of possible suppliers to perform the pavement condition surveying of roads in Oklahoma.I was mandate to perform a survey in Oklahoma.
Here is a summary of the data that was be required for the Oklahoma DOT Control Sites. Each Control site needed to be run 5 times:
- Video log images (one pavement view and two right-of-way views) at a 0.005 mi. interval.
- GPS data at 0.01mi. interval.
- IRI data at 0.01 mi. interval.
- Rut data at 10.56 ft. interval.
- Faulting data; number of faults and standard deviation for each 0.01 mi interval.
- Geometric data (grade, cross slope and radius of curvature) at a 0.01 mi. interval.
- Distress data at 0.01 mi. according to ODOT protocols.
Please refer to the ODOT documents that I faxed you for a more detailed description. The control sites are clearly indicated with paint marks. If the operator is having trouble to locate them they can call William A Dickinson (405) 555-5555 from the ODOT and he will assist them in locating the sites
Picture Gallery

No comments:
Post a Comment